Columbia Manhattanville
OVERVIEW
Developing on a 17-acre plot between 125th and 133rd street is home to the expansion of Columbia University’s Manhattanville. The multipurpose academic campus plan will include complete construction, renovations and upgrades to serve the 17-acre plot. TEC Systems, Inc was contracted to be a part of the growing construction to provide state-of-the-art integration practices for the industrial level plant’s equipment and required devices. Understanding the massive scale and density of the construction at hand, TEC had to demonstrate and introduce new applications and practices to ensure the running conditions and flexibility of the campus was covered through a scalable BMS. Utilizing energy management systems such as Rockwell Automation and Schweitzer Engineering seamlessly integrated the intricacy of the sequence of operations throughout the operator interfaces and panel workstations; this hardware to programming distribution throughout the central energy plant, better known as the Mind, Brain & Behavior Institute became the staple to help implement usability, and better-allocate management effortlessly.
Highlights
14 Workstations, 7 Monitors, 1 60” Monitor that showcases facility overview
22 SCADA Servers running with historian server over secure Columbia LAN network to effectively trend data to enable faster and effective decisions
3Alarms created for under plumbing section that carefully monitors and notifies if any alarms on the numerous pumps on campus
4Fire alarm and gas detection are easily monitored to assure proper emergency sequences are operating properly
5Numerous AC units and exhaust fans serve the multiple mechanical rooms to maintain proper air quality and temperature
6Sophisticated steam system in place that effectively monitors the flow pressure and temperature
7The DCS system shall monitor valve open and closed position and common trouble alarmLocation
New York, NY
Project completed
2016
DETAILS
Owner and Developer:
Manhattanville Development
Architects:
Renzo Piano
Construction Manager:
Bovis Lend Lease
MEP Engineer:
Jaros Baum & Bolles
Utilities
This site uses analytics, cookies and/or other 3rd party technologies that may have access to your data, which are used to provide a quality experience. If you do not agree, opt out and we will not load these items, however, necessary cookies to enable basic functions will still load. Visit our Privacy Policy to learn more.Contact Us:Email us at info@tec-system.com for requests involving data we collect. View our Privacy Policy for more info.Opt In / Out:To change your opt in settings, please click here to opt out or in. Or, close this popup.